Demo workspace.
Data is generated and resets on restart. Nothing is sent, flown or charged.
View as another role
Reset
Missions
/
Planner
Search or run a command
⌘K
Ask
Advisor
8
Fleet
Missions
Maintenance
Safety
Settings
English
Türkçe
Deutsch
Español
العربية
English
Türkçe
Deutsch
Español
العربية
Mission planner
--:--
UTC
All sites
Missions
All missions
Scheduled
Templates
Nacelle Thermal Check
Carbon County Wind
Oct 31, 2026 01:52
In flight
Panel Row Thermal Scan
Eldorado Valley Solar
Oct 31, 2026 10:00
Approved
Trailer Move — Gate 2
Long Beach Yard
Oct 31, 2026 10:45
Approved
Guy-Wire Inspection
Bend Ridge Towers
Oct 31, 2026 11:30
Approved
Parcel Drop — Dock 4
Long Beach Yard
Oct 31, 2026 12:15
Approved
Pipeline Corridor Scan
Edmonton Lateral
Oct 31, 2026 16:00
Approved
Solar Farm Survey
Eldorado Valley Solar
Nov 1, 2026 10:30
Ready
1 of 22
Site boundary (keep-in)
Neighbour property (keep-out)
Gust zone B (caution)
1
2
3
4
5
6
H
Draw
Waypoints
POI
Geofence
▲
N
100 m
Distance
1.7 km
Est. time
4 min
Waypoints
6
Coverage
7.5 ha
Mission settings
In flight
MSN-25641
Mission name
Site
Eldorado Valley Solar
Carbon County Wind
Edmonton Lateral
Licking County Quarry
Bend Ridge Towers
Austin Substation
Duwamish Bridge
Long Beach Yard
Unit
Unassigned
DRN-SRV-102 (busy)
DRN-SRV-109 (busy)
DRN-SRV-116
DRN-DEL-066
Scheduled (UTC)
Flight parameters
Altitude
m
Speed
m/s
Battery reserve
%
Payload
RGB Camera
Thermal Camera
LiDAR
Multispectral
Cargo Box
Gas Sensor
None
Weather conditions
Now
8°C
24 km/h
03:00
7°C
26 km/h
04:00
7°C
26 km/h
05:00
9°C
24 km/h
06:00
10°C
24 km/h
Simulated forecast · no weather API is called.
Preflight checks
Clear
Open live view
Abort mission