Demo workspace.
Data is generated and resets on restart. Nothing is sent, flown or charged.
View as another role
Reset
Missions
/
Planner
Search or run a command
⌘K
Ask
Advisor
8
Fleet
Missions
Maintenance
Safety
Settings
English
Türkçe
Deutsch
Español
العربية
English
Türkçe
Deutsch
Español
العربية
Mission planner
--:--
UTC
All sites
Missions
All missions
Scheduled
Templates
Panel Row Thermal Scan
Eldorado Valley Solar
Oct 31, 2026 10:00
Approved
Trailer Move — Gate 2
Long Beach Yard
Oct 31, 2026 10:45
Approved
Guy-Wire Inspection
Bend Ridge Towers
Oct 31, 2026 11:30
Approved
Parcel Drop — Dock 4
Long Beach Yard
Oct 31, 2026 12:15
Approved
Pipeline Corridor Scan
Edmonton Lateral
Oct 31, 2026 16:00
Approved
Solar Farm Survey
Eldorado Valley Solar
Nov 1, 2026 10:30
Ready
Wind Farm Inspection
Carbon County Wind
Nov 2, 2026 09:00
Scheduled
1 of 21
Site boundary (keep-in)
Zone 7 — live equipment (keep-out)
1
2
3
4
5
6
7
8
9
H
Draw
Waypoints
POI
Geofence
▲
N
100 m
Distance
2.2 km
Est. time
6 min
Waypoints
9
Coverage
12.5 ha
Mission settings
Scheduled
MSN-25653
Mission name
Site
Eldorado Valley Solar
Carbon County Wind
Edmonton Lateral
Licking County Quarry
Bend Ridge Towers
Austin Substation
Duwamish Bridge
Long Beach Yard
Unit
Unassigned
DRN-SRV-106
DRN-SRV-113
DRN-SRV-120
DRN-DEL-072
BOT-INS-001
BOT-INS-002
BOT-INS-003
BOT-INS-004 (busy)
Scheduled (UTC)
Flight parameters
Altitude
m
Speed
m/s
Battery reserve
%
Payload
RGB Camera
Thermal Camera
LiDAR
Multispectral
Cargo Box
Gas Sensor
None
Weather conditions
Now
14°C
11 km/h
07:00
14°C
11 km/h
08:00
15°C
13 km/h
09:00
16°C
15 km/h
10:00
16°C
9 km/h
Simulated forecast · no weather API is called.
Preflight checks
Clear
Mark ready for approval