Anomalies in health, battery and link quality across the fleet.
Open an inspection for the comms system before the next long mission.
Open DRN-SRV-119Open an inspection for the comms system before the next long mission.
Open TRK-YRD-024Finish the open work order, then release to service.
Open DRN-DEL-075Finish the open work order, then release to service.
Open BOT-INS-006Check the antenna connectors and move the ground station for this site.
Open DRN-SRV-109Check the antenna connectors and move the ground station for this site.
Open DRN-SRV-115Schedule the v2.4.1 update at each unit’s next inspection.
Deep discharges shorten pack life. Raise the return-home threshold for these routes.
AI add-on:Model: Claude Haiku 5.5 · 12 credits per run· 12 of 22,500 credits this month (0%)· 1 of 40 requests this hour