Anomalías de salud, batería y calidad de enlace en la flota.
Open an inspection for the comms system before the next long mission.
Abrir DRN-SRV-119Open an inspection for the comms system before the next long mission.
Abrir TRK-YRD-024Finish the open work order, then release to service.
Abrir DRN-DEL-075Finish the open work order, then release to service.
Abrir BOT-INS-006Check the antenna connectors and move the ground station for this site.
Abrir DRN-SRV-109Check the antenna connectors and move the ground station for this site.
Abrir DRN-SRV-115Schedule the v2.4.1 update at each unit’s next inspection.
Deep discharges shorten pack life. Raise the return-home threshold for these routes.
AI add-on:Modelo: Claude Haiku 5.5 · 12 créditos por ejecución· 24 de 22,500 créditos este mes (0%)· 2 de 40 solicitudes esta hora